| A true landmark project in environmentally conscious construction, the Blue Planet in Chatterley Valley is the UK’s first carbon positive, BREEAM excellent rated logistics park. It was therefore essential that the procurement routes of this project met the same exacting environmental standards and that the design quality of the cladding itself reflected the high profile nature of the project. Horizontal and vertical cladding panels were manufactured off-site, then installed and aligned using BCL’s dynamic bracketing system along with all aluminium feature trims. BCL also provided the cladding to the structural Glu-lam beams at the side of the building. |
Client: Gazley Architect: Chetwood Associates Contractor: McLaren Size: 1000m2 Location: Chatterly Valley, Stoke Duration: 10 weeks Completion: December 2008 Features |